The current stove will be replaced with a cooktop with a single oven built in below and a microwave above. The brick column (which covers the old stove pipe) will be demolished, and brick pavers will be installed in two columns, with a connecting arch above, to surround the cooktop area.
![]() Week 0 |
![]() After 2 days of demolition - Stove, cabinets, shelves gone |
![]() End of Week 1 - Transom is down |
![]() End of Week 2 - Brick tower is gone |
![]() End of Week 5 - New back door. New subfloor and joists. Electricals started |
![]() Week 12 - New tile floor. Cabinets installed |
![]() Week 14 - Countertops installed. Fabulous backsplash, mosaic and tile work! Appliances now functional. |